Solar Depot Logo PNG
Back

Cessna Road Storage

Cessna Road Storage banner

This 180 kW project demonstrates Solar Depot’s ability to tackle large projects with ease.

The Inglewood project is in effect a Solar Farm and involved the fitment of 18 inverters and over 947 Solar Panels.

The project involved significant site preparation and civil works to facilitate the ground arrays. The project duration was 4 months. Prerequisites for this project were strict compliance with Aviation Regulations and Local Regulatory Body constraints. The project was completed on time and under budget.

  • Number of Sites: 1
  • Number of Panels: 947
  • Total Power: 180 kW
  • CO2 Emission Saved Per Year: 216 tons

Project Gallery