Bob Jane T-Mart

Bob Jane T-Mart Prospect SA

Project Size 13.5 kW

This project demonstrates a large angle-framed installation. The electricity savings are calculated to be $7,600 in the first year with payback time estimated to take 2.23 years. Solar Depot also replaced their lighting to LED. Bob Jane would have needed a 17-18KW system before Solar Depot replaced the lighting.